Logo
Search
Login
Sign Up
Logo
Oliver Buchannon
Mill Floor

Written by active DRI-EAF operators. Anonymous by necessity, specific by design.

The Iron You Already Paid For Is in the Slag Pot

Jul 27, 2026

•

3 min read

The Iron You Already Paid For Is in the Slag Pot

One point of metallic yield is $3-4 per tonne of liquid steel. FeO in the slag is where it goes.

Mill Floor
Mill Floor
The Two Numbers on the DRI Cert

Jul 20, 2026

•

4 min read

The Two Numbers on the DRI Cert

Metallization and carbon decide your heat before the first kWh — most shops never read them.

Mill Floor
Mill Floor
The Real Cost of an Hour Off-Power

Jul 13, 2026

•

4 min read

The Real Cost of an Hour Off-Power

An hour off-power doesn't cost you its kWh. It costs you the tonnes you'd have made in it.

Mill Floor
Mill Floor
Predictive Maintenance Pays on a Short List of Assets

Jul 6, 2026

•

3 min read

Predictive Maintenance Pays on a Short List of Assets

PdM is sold as a plant-wide platform. It returns as three or four assets — the rest is dashboard.

Mill Floor
Mill Floor
The CBAM Number Your Finance Team Is Modeling Wrong

Jun 29, 2026

•

4 min read

The CBAM Number Your Finance Team Is Modeling Wrong

A €120/t gap between BF-BOF and scrap-EAF isn't a rounding error. It's a structural moat that widens every year.

Mill Floor
Mill Floor
What Stegra's First Heat Won't Prove

Jun 22, 2026

•

4 min read

What Stegra's First Heat Won't Prove

First heat proves the chemistry. The electrolyzer's capacity factor decides the economics.

Mill Floor
Mill Floor
Your Electrode Bill Is Three Problems, Not One

Jun 15, 2026

•

4 min read

Your Electrode Bill Is Three Problems, Not One

kg/t blends tip wear, side oxidation, and breakage — and you can only fix them one at a time.

Mill Floor
Mill Floor

The Mill Floor

Written by active DRI-EAF operators. Anonymous by necessity, specific by design.

© 2026 The Mill Floor.
beehiivPowered by beehiiv